Step-by-step solved example
Sand, <5% fines, D10=0.15, D30=0.40, D60=1.20 mm. SW or SP?
1. Cu, Cc
Cu=1.20/0.15=8.0 ≥6. Cc=0.16/(0.15×1.20)=0.89.
2. Grade
Cc=0.89 not in [1,3] → SP (poorly graded sand).
Answer: SP (Cu OK but Cc < 1)
Sand, <5% fines, D10=0.15, D30=0.40, D60=1.20 mm. SW or SP?
1. Cu, Cc
Cu=1.20/0.15=8.0 ≥6. Cc=0.16/(0.15×1.20)=0.89.
2. Grade
Cc=0.89 not in [1,3] → SP (poorly graded sand).
Answer: SP (Cu OK but Cc < 1)
1.A-line equation is
2.CH is
3.GW requires Cu≥
4.More than 12% fines on a sand makes it
5.D10 is
6.LL=40, PL=22: PI=
7.Pt is
8.Cc=2, Cu=8, clean sand →
9.AASHTO classification uses
10.Gap-graded soils often fail