Step-by-step solved example
Q = 10,000 m³/d, X = 2500 mg/L, A = 250 m². SL? (ignore recycle)
1. Mass rate
X = 2500 mg/L = 2.50 kg/m³. M = Q X = 10,000 × 2.50 = 25,000 kg/d.
2. Loading
SL = M/A = 25,000/250 = 100 kg/m²·d.
Answer: SL = 100 kg/m²·d
Q = 10,000 m³/d, X = 2500 mg/L, A = 250 m². SL? (ignore recycle)
1. Mass rate
X = 2500 mg/L = 2.50 kg/m³. M = Q X = 10,000 × 2.50 = 25,000 kg/d.
2. Loading
SL = M/A = 25,000/250 = 100 kg/m²·d.
Answer: SL = 100 kg/m²·d
1.Q = 6000 m³/d, X = 3000 mg/L, A = 300 m². SL =
2.Overflow rate vo = Q/A has units of
3.Including recycle, the solids load on a secondary clarifier uses
4.A high SVI (bulking) means the allowable SL
5.2500 mg/L equals
6.Primary clarifiers run at much lower SL than secondary because
7.M = 12,000 kg/d, A = 200 m². SL =
8.If area is halved at the same M, SL
9.Solids flux theory plots
10.Q = 8000 m³/d, X = 2500 mg/L, A = 400 m², no recycle. SL =