219/33310–15FE Reference Handbook 10.4 · Civil · Stormwater

Handbook formula

Detention Basin Storage Routing

Level-pool routing: average inflow minus average outflow equals storage change. Pond outflow is weir/orifice of HW. Peak O < peak I if there is storage.

Inflow
Outflow
Storage

Step-by-step solved example

Over 10 min, I goes 20→10 cfs (avg 15), O avg 6 cfs. ΔS?

IOL
Pond: inflow hydrograph vs outflow; ΔS = (I−O)Δt.
  1. 1. Δt

    10 min=600 s.

  2. 2. ΔS

    (15−6)×600=5400 ft³.

Answer: ΔS = 5400 ft³

10 practice questions

0/10 correct

1.If O=I always, storage is

2.A weir outlet O ∝

3.Retention vs detention

4.Trapezoidal rule on a hydrograph is

5.Peak reduction (attenuation) grows with

6.Emergency spillway is sized for

7.Δt=5 min, Ī=8 cfs, Ō=3 cfs: ΔS=

8.Stage-storage curve is

9.Pre- vs post-development: detention aims to

10.Pump station sump uses the same